Client Profile
Powder coating metal finishing shop
Project Profile
Consulting services were provided to this client to help it comply with environmental regulations.
Project Summary
Letterle was asked to help this client comply with its obligations as a generator of residual waste and a discharger of industrial wastewater. An on-site review of the manufacturing process, file review, and a meeting with PADEP resulted with the conclusion that the facility was exempt from filing a biennial residual waste report. However, it was still necessary to conduct a chemical analysis and source reduction strategy, as well as to obtain a permit and monitor industrial wastewater before discharging to the publicly-owned sewage treatment plant.
Project Results
A waste stream analysis was conducted, and after negotiations with federal, state, and local agencies, the proper reports were filed and measures taken to ensure continued compliance with PA residual waste regulations and federal pre-treatment wastewater discharge requirements.